Case Study

How AkzoNobel Improved On-Time Delivery 16% with TrakSYS

AkzoNobel
TrakSYS
AkzoNobel
× TrakSYS
Company
AkzoNobel
Location
Mauá, São Paulo, Brazil
Industry
Paints & Coatings
Partner
HSI
16% MORE ON-TIME DELIVERY
16% MORE ON-TIME DELIVERY

AkzoNobel's Mauá plant increased on-time delivery of finished goods by 16% after implementing TrakSYS.

FEWER PROCESS ERRORS
FEWER PROCESS ERRORS

Integrating TrakSYS with SAP gave the team visibility into root causes, reducing production process errors.

LESS OVERTIME, MORE OUTPUT
LESS OVERTIME, MORE OUTPUT

AkzoNobel reduced overtime and outsourced labor costs while meeting production demand in fewer shifts.

TrakSYS is a powerful tool for quickly uncovering the root causes of production problems. It has empowered our Lean program by systematically eliminating production bottlenecks. In fact, for some of our critical systems, we envision doubling our measured productivity. This has enabled us to reduce overtime and meet the production demand in fewer shifts.

Sérgio Oliveira
Rocha Site Manager

The Company

AkzoNobel is one of the world's leading decorative paint companies, with brands including Dulux, International, Sikkens, and Interpon trusted by customers around the globe. Headquartered in Amsterdam, AkzoNobel is active in more than 150 countries and employs over 34,000 people.

In Brazil, AkzoNobel operates eleven strategically located chemical manufacturing sites. The largest, in the Mauá municipality, produces paint and resin across three sites. As product and production demand grew, the Mauá team needed to optimize its operation, and worked with Parsec Automation, LLC certified partner HSI to implement a TrakSYS rollout built around its existing infrastructure.

The Challenge

AkzoNobel needed a system that could establish a sustainable Lean culture, create user-specific dashboards for monitoring electronic batch records, and eliminate the production bottlenecks that were limiting filling area performance. The team also needed accurate, real-time information to support effective decision-making, track production through every stage, and increase operator engagement on the floor.

The Solution

HSI designed the TrakSYS solution to work with AkzoNobel's existing SAP ERP system, giving the Mauá team the ability to download SAP orders, sequences, required materials, work instructions, scheduling and production orders, and other reports directly through TrakSYS.

The rollout gave AkzoNobel visual management support through Andons, mobile data collectors across production areas, and management of the bill of materials, work-in-process, and production queues. TrakSYS also helped manage the performance of filling lines through OEE tracking and supported implementation of standard operating procedures across the site.

The Impact

AkzoNobel's Mauá plant saw a 16% increase in on-time delivery of finished goods, along with a reduction in production process errors and improved scheduling and production planning. The integration between TrakSYS and SAP gave the team visibility into the root causes of production bottlenecks, while reducing overtime and outsourced labor costs.

The team credits AkzoNobel's employee buy-in, driven by technology that fit how the plant already worked, as a key factor behind the significant Lean and continuous improvement milestones reached since implementation.

Download

See Exactly How it Works

Get the full case study, including AkzoNobel's TrakSYS solution architecture and results from its Mauá, Brazil plant.

Speak with an advisor

Curious how TrakSYS could improve your operation?

See what clarity on the plant floor looks like. Book a personalized walkthrough of TrakSYS with a Parsec solutions engineer.